How to calculate it

For a slab or footing, multiply length × width × thickness, all in feet, to get cubic feet. Divide by 27 for cubic yards. For a round post hole or column, use π × radius² × depth.

Formula: cubic yards = length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27.

Bag counts come from the yield of each bag: roughly 0.30 cubic feet for a 40 lb bag, 0.375 for 50 lb, 0.45 for 60 lb and 0.60 for 80 lb. Always check the yield printed on your brand of bag, because it varies slightly.

Worked example

A 12 ft × 10 ft slab poured 4 inches thick, with 10% extra:

Volume (no extra)40 cu ft 1.48 cubic yards
Concrete to order1.63 cubic yards includes 10% extra
40 lb bags147 bags each yields about 0.3 cu ft
50 lb bags118 bags each yields about 0.375 cu ft
60 lb bags98 bags each yields about 0.45 cu ft
80 lb bags74 bags each yields about 0.6 cu ft
Cubic meters1.25 m³

Bags needed per cubic yard

Bag sizeYieldBags per cubic yard
40 lb0.30 cu ft90
50 lb0.375 cu ft72
60 lb0.45 cu ft60
80 lb0.60 cu ft45

Tips

Frequently asked questions

How many bags of concrete are in a cubic yard?

About 45 bags of 80 lb, 60 bags of 60 lb, or 90 bags of 40 lb mix. Always check the yield on your brand.

How much concrete do I need for a 10 × 10 slab?

At 4 inches thick, a 10 ft × 10 ft slab is 33.3 cubic feet, or about 1.23 cubic yards. With 10% extra, plan on about 1.4 cubic yards.

How much concrete do I need for a post hole?

A hole 10 inches across and 3 feet deep holds about 1.6 cubic feet, so about three 80 lb bags. The calculator handles the exact numbers.

Should I order extra concrete?

Yes. A 5–10% allowance is normal for ready-mix, and slightly more if your forms or sub-base are rough.